Add the observation
- Open the project and choose Observations in the sidebar.
- Click New observation in the top right.
- At the top of the form, choose Needs Action if someone has to put it right, or Positive to record good practice.
- Give it a Title and a Description, and pick its Type, the Company that puts it right and, optionally, the Assignee.
- Optionally, add photos under Photos and files: drag them into the box, or click Choose Files. On a phone, Choose Files also offers the camera.
- Fill in the rest in the Details panel on the right, under its tabs: Where (Location, Trade), People (Reviewer, Distribution, Private), When (Priority, Due) and Impact. The fields marked with an asterisk (*) are needed: a Title to save at all, a draft included, and to publish, a Type and, for a Needs Action observation, a Company. The Reviewer, the Due date and the Distribution may already be filled in from your project's defaults: see Set observation defaults. Change them if they don't fit. Type, Trade, Company, Assignee and Reviewer open a list with a search box at the top: start typing to narrow it. Company lists the companies on this project.
- Click Publish.
StruXure gives the observation the next number on the project and opens it with the message Published. A Needs Action observation is Open; a Positive one is Closed straight away.
To leave without saving, click Cancel.
If what you saw has a place on the drawings, you can start the observation from the sheet instead: see Raise an observation from a drawing. If a form question was answered Fail, No or At Risk, start it from the form: see Raise an observation from a Deficient answer.
Save it as a draft instead
Click Save as draft instead of Publish to finish it later. A draft is seen only by you and observation admins. When it's ready, open it and click Publish: see Edit or publish an observation.
What each field is for
On the left:
| Field | What to enter |
|---|---|
| Title | A short description people will recognize on the register. Needed to save, a draft included. |
| Description | What was seen, where, and what putting it right looks like. |
| Type | The kind of observation, such as Safety or Quality, from your project's list. Its Category is shown beside it. Needed to publish. |
| Company | The company that will put it right. Needed to publish a Needs Action observation. |
| Assignee | Optional: the person at that company. If you choose only a person, their company is filled in for you. |
| Photos and files | Photos of what was seen, and any other files that belong with it. |
In the Details panel on the right:
| Tab | Field | What to enter |
|---|---|---|
| Where | Location | Where on site. Start typing to search the project's locations, or type a new one and choose Add "…" as a new location. |
| Where | Trade | The trade the work belongs to. |
| People | Reviewer | The person who accepts the work. With nobody named, whoever raised it does. |
| People | Distribution | Who it is copied to, and told when it moves on or gets a comment. See Who hears about an observation. |
| People | Private | Tick to keep it to observation admins, you, the assigned person, the Reviewer and the people on its Distribution. Ticked for you when the type starts private. See Make an observation private. |
| When | Priority | Low, Medium or High. Starts at Medium. |
| When | Due | When it needs to be put right. |
| Impact | Cost impact / Schedule impact | Whether it affects cost or schedule: Not assessed, Yes or No. |
Your company may have added its own fields to observations. They're in the Details panel after each tab's own fields. One marked with an asterisk (*) is needed to save the observation, as a draft too: saved without it, the reason is under the field. See Add your own fields to RFIs, submittals, punch items, spec sections, observations and Daily Report entries.
When you choose Positive, the Company, Assignee, Reviewer and Due fields are hidden, because a Positive observation doesn't have them.
On a phone, the Details panel comes after the form, below Publish.
If something goes wrong
If something stops the observation from publishing, the message appears under the field to put right, and the form scrolls to it. If the field is in the Details panel, its tab opens.
- "Choose a type before you publish." Pick a Type, or click Save as draft.
- "Choose the company that will put it right before you publish." Pick a Company, or record it as Positive.
- "The assignee must work for the chosen company." Pick someone at that company, or leave Assignee empty.
- If some photos didn't upload, the observation is still saved, and its page says how many files didn't upload. Add them again under Photos and files.
- If you don't see New observation, you have read-only access to observations.