StruXure
/

Edit or publish an observation

Change an observation's details where they are, publish a draft, and see who changed what.

Who this is forProject managers, Superintendents, Field engineers, Safety managers

Permission neededObservations — Write

The person who raised an observation, and observation admins, can change its details and publish it.

Change the details

The observation's page shows the title and description on the left, and Priority, Due date, Company, Assignee, Reviewer, Type, Location, Trade, Cost impact, Schedule impact and Private in a column on the right. Company lists the companies on this project.

  1. Open the observation from the register.
  2. Click the value you want to change.
  3. Pick the new value, and it saves. For the Title or Description, type the change and click Save.

Press Esc or click Cancel to leave a value as it was. If a change can't be saved, the reason shows under it and what you typed is kept. The Title is marked with an asterisk: it can be changed but not left empty.

While the observation is a draft, What it is above the title lets you change it between Needs Action and Positive. After it is published, it shows only as the badge beside its status, and a Needs Action observation drops that badge once it is Closed. A Positive observation has no Company, Assignee, Reviewer or Due date.

Your company's own observation fields are in the column on the right too, at the end of the section each belongs to. A dropdown or date saves as soon as you pick; text and numbers show Save and Cancel. One marked with an asterisk (*) can be changed but not cleared.

On a narrow screen, such as a phone, the details on the right come first, above the description.

Publish a draft

  1. Open the observation from the register. A draft says This is a draft. at the top.
  2. Click Publish at the top of the page.

It must have a Title and a Type, and a Needs Action observation must have a Company; each is marked with an asterisk. A draft saved as Untitled needs a title before it can be published. If one is missing, the page says what to add under that field. Choose it there, then click Publish again. A Needs Action observation becomes Open; a Positive one becomes Closed. The Saved as a draft message goes once it is published.

See who changed what

Observation admins see two tabs under the observation's title: Details and History. Click History to see its trail. It lists, newest first, when it was raised and published, the form question it was raised from if it was, every change to a field with its old and new value (making it private or public included), when it was moved to the recycle bin or restored, each change of who it's waiting on, and who viewed it or downloaded its files. Status changes have a blue label, so they stand out. Several field changes made by one person within a minute of each other show as one Field updates row, such as "6 field updates"; click it to see each change, and click it again to hide them.

Good to know

  • If the values can't be clicked and you don't see Publish, the observation was raised by someone else and you aren't an observation admin.
  • Distribution sits under Description: see Who hears about an observation.

Related articles

Last updated November 20, 2026