Choose which observations
The PDF report and the CSV export both take the observations you've ticked on the register. If none are ticked, they take every observation the register is showing, with your current tab, filters, search and sort. The tick box in the heading row ticks every observation shown.
Only observations you can see are included. Observations in the recycle bin never are.
Make a PDF report
- On the register, click PDF Report.
- Choose a Layout:
- List: one row an observation, with the quality observations first and then the safety ones. This is the default.
- Detail: each observation on its own page, with its photos and comments. A photo whose malware check hasn't come back clean is printed without its picture.
- Click Create PDF. It opens in a new tab, ready to print or save.
The list shows each observation's number, title, type, status, company, who it's waiting on, location, priority, due date (with Overdue when it is) and how many photos and files it has. A detail page also shows whether it is Positive or Needs Action, its Category, trade, assignee, Reviewer, cost and schedule impacts, who raised it and when, when it was closed, whether it is private, its description, its photos, a list of its files and its comments. Numbers, photos and files link back to StruXure.
A detail report can hold up to 100 observations. For more, tick the ones you want, or print the list. To print one observation, tick just that one and make a Detail report.
A detail report is recorded in each observation's history as a download by you.
Export to a spreadsheet
Click Export CSV. A file called observations-<project>-<date>.csv downloads. Open it in Excel, Google Sheets or Numbers.
The file always has the same columns, whatever you've shown on screen: Number, Title, Type, Category, Positive / Needs Action, Status, Overdue, Company, Assignee, Reviewer, Waiting on, Priority, Due date, Location, Trade, Cost impact, Schedule impact, Private, Raised by, Raised and Closed (in the project's time zone), Photos and files, and Description. After them comes a column for each field your company added to observations, hidden ones included. The PDF report doesn't list those fields.