Edit an RFI's details

Change the due date, assignees, priority or any other detail of an RFI right where it's shown, without making a new revision.

Who this is forProject admins, RFI admins

Permission neededRFIs — Admin

You change an RFI's details one at a time, right where they're shown. There's no separate edit page, and changing a detail doesn't make a new revision.

  1. Open the RFI.
  2. In the Request or General Details card, click the value you want to change. A pencil appears when you point at a value you can change. For a few values that contain links, such as Specifications and Drawings, click the pencil next to the value instead.
  3. Change it:
    • Dropdowns (RFI manager, responsible contractor, priority, reason, project stage, location, specification, and the cost and schedule questions) save as soon as you pick a new value.
    • Due date saves a moment after you pick a date from the calendar. If you type the date, it saves about a second after you stop typing. Press Enter to save it straight away.
    • Assignees (To), Distribution list (CC), Drawings and the impact details show Save and Cancel. Press Ctrl+Enter (⌘+Enter on a Mac) to save. In a one-line box, Enter saves too.
  4. Press Esc or click Cancel to leave a field without changing it.

What you can change here

Card Values
Request Assignees (To) (including the Required ticks), Distribution list (CC), Responsible contractor, Due date
General Details RFI manager, Specifications, Drawings, Location, Reason, Project stage, Priority, Cost impact?, Schedule impact?, Schedule critical?, and the cost and schedule impact details

The cost and schedule impact details appear once the impact is Yes, or if they already have text.

What you can't change here

  • Subject and Message. Rewording the question makes a new revision, so the earlier wording is kept. Click Create New Revision (or Edit on a draft). See Change the question with a new revision.
  • Received from, the RFI number, Created by, Waiting on and Days open.
  • Private. Use Make private or Make public in the More menu. See Private RFIs.
  • The status. Use the buttons at the top of the page: Send, Close RFI, or Cancel, Reopen and Reinstate in the More menu.

Good to know

  • Every change is on the record. Each save that changes something adds a Details changed entry to the RFI's History tab, saying what changed, for example "Priority: Medium → Urgent" or "Assignees: added …; removed …". Saving the same value again records nothing.
  • Waiting on updates itself. Changing the To line, the Required ticks or the manager can change who the RFI is waiting on. See Who an RFI is waiting on.
  • Editing doesn't email anyone. Adding someone to the To or CC line doesn't send them the RFI.
  • You can edit details at any status, including on a closed or cancelled RFI.
  • If a change can't be saved, the box stays open and says why underneath, for example when a person isn't in the project's directory.
  • Without Admin access to RFIs, the values are plain text with nothing to click.