Import a bid schedule into the schedule of values

Bring a unit-price Prime Contract's items in from the bid schedule your estimating system exports, checked row by row before anything is saved.

Who this is forProject managers, Project executives, Contract administrators

Permission neededFinancials — Edit

Financials is an add-on. If your company has it, you can bring a unit-price Prime Contract's items in from the bid schedule your estimating system exports, such as a HeavyBid bid tab (.xlsx) or HeavyBid CSV, instead of typing them. You check the file first. Nothing is saved until you import it.

If your company has renamed "Schedule of Values" or "Prime Contract" under Settings → Financials, the pages use your words.

Before you start

Check the file

  1. Open the project and choose Prime Contract under Financials in the sidebar.
  2. Above the Schedule of Values grid, click Import a bid schedule.
  3. Choose the Import profile for the file's layout.
  4. Choose the File, up to 10 MB.
  5. Click Check the file.

The check shows:

  • The summary: the file, the profile it was read with, the sheet and heading row, how many Items were read and Rows skipped, Items with no quantity, Lump-sum items, each section's total and the Total.
  • Rows: every row read, with what it was Read as:
    • Item: its item number and owner item, description, section, quantity, unit, unit price and value. The value is always the quantity × unit price, rounded to the cent; a total column in the file is never used. A lump-sum item says Lump sum, and a unit not in your units list says Not in your list.
    • Skipped: why, for example It has no item number. for a section heading or subtotal, or Its record type is P. for a HeavyBid pricing row.
    • Problem: what is wrong with the row.

An item with a quantity of 0 is kept: bid forms carry items that aren't quantified yet.

Changing the profile or the file puts the check away; click Check the file again.

If it cannot be imported

It cannot be imported lists what is wrong, with the row numbers. For example:

  • a quantity that isn't a number, for example lots, or no quantity at all
  • a unit price that isn't an amount, or has more than four decimal places
  • an item number that is on two rows
  • more than 500 items
  • the Prime Contract is Lump sum, or has left Draft

Correct the file, or choose another profile, and check it again.

If your company has no bid schedule import profiles yet, the page says No bid schedule import profiles yet. and, if you can see settings, links to where they are added.

Check these

Check these lists what the import does that you may want to know. None of it stops the import:

  • a unit not in your units list: the items keep it. Add it under Settings → Financials if you use it.
  • a cost code not in your cost code list: the items are imported without it.
  • a section the contract doesn't have yet: it is added, with its authorized amount set to its items' total. Change the amount afterwards on the Sections card. See Divide a unit-price contract into sections.

Import it

Click Import, which shows how many items it imports, for example Import 42 items. If the schedule of values has lines now, the page says Replaces the number of current lines. You're taken back to the Prime Contract, where the items are on its schedule of values. Cancel leaves without importing.

If the file, the profile or your lists changed after the check, the import is refused with The file, the profile or your lists have changed since it was checked. Check it again, then import it. Nothing is saved.

Who can do what

  • With Financials — Edit on the project, you see Import a bid schedule while the Prime Contract is a unit-price Draft, and can check and import a file.
  • With Financials — Read, you can see the schedule of values but not import one.